• Reverse rod in tower, engaged  - pic 1
  • Outside of tower where to drill              - pic 2
  • Headache switch -Napa # NS119   -pic 3
  • Setting up drill press for drilling   -pic 4
  • Drill in process    - pic 5
  • tapping away   -pic 6
  • tapped hole   - pic 7
  • Switch installed with button exposed  pic 8
  • Reverse Rod meeting switch button  - pic 9
  • Fully engaged reverse rod - pic 10
  • testing electrical connection with ohm meter - pic 11
  • Rough sketch of  rod and switch relationship - pic 12
  • 40-53backuplamps - pic 13
  • Access to end of reverse rod - pic 14
  • Top view of grounded edge of reverse rod - pic 15
  • Easy access for dremmel tool  - pic 16
  • Good switch / Bad switch -pic 17
  • Good switch stock before rounding button - pic 18
  • Good switch in place - pic 19
  • Tower installed with switch -pic 20
  • Terminal after being bent -pic 21
  • Backup lights installed and powered -pic 22
1